CONSTRUCT THE SEW COMPONENTS VIETNAM II FACTORY
Project name | CONSTRUCT THE SEW COMPONENTS VIET NAM II FACTORY |
Scope of work | Supply and construct the prestressed cable |
Location | Thang Long Industrial Park II |
Owner | SEWS-COMPONENTS VIETNAM CO., LTD |
Design Consultant | VIETNAM NATIONAL CONSTRUCTION CONSULTANTS CORPORATION - JSC |
Supervision Consultant | Hazama Ando Coporation |
Prestressed Cable Contractor | Minh Duc Post-Tension Co., Ltd |
Scale | Level 1 building The factory has 2 floors, each floor has an area of 12,000 m2 |
Prestressed cable details: Diameter 15.24mm, origin: China Weight: 25 tons | |
Start time | 07/2019 |