11TH ANNIVERSARY OF MINH DUC GROUP

Minh Duc Group - "11 years in my heart" Minh Duc Group- “Connecting Strength, Connecting Success” Buổi lễ sinh nhật ấm cúng kỉ niệm 11 năm thành lập tập đoàn Minh Đức diễn ra trong sự hân hoan của hàng trăm CB CNV của tập đoàn Minh Đức tại trụ sở chính ở 301 Phúc Lợi, Hà Nội, và sự tham gia trực tuyến của các CB CNV ở chi nhánh miền Trung, miền Nam, và Campuchia.
Thông tin file

HAPPY NEW YEAR 2021

2020 is really not an easy year, when having to cope with the raging of the global Covid-19 epidemic, natural disasters and floods throughout the Central region... while maintaining work and life at a normal level. possible and Minh Duc Group is no exception.

LOOK AT ONE YEAR OF ACTIVITIES OF MINH DUC GROUP 2020

In 2020, Minh Duc Group implements its operation, production and business plans in the context of facing many unprecedented difficulties and challenges such as the global Covid-19 pandemic, natural disasters and floods throughout the central region. The international transport crisis has had a huge negative impact on production

MUD PPCC PROJECT

BASIC INFORMATION

Project name

MUD PPCC Project

Scope of work

Design, supply and construction of prestressed floor

Address

City Center, Phnom Penh, Cambodia

Owner

Global Tech exchange Co.,Ltd GFC company Limited

Main contractor

ST ADVANTIUM CONSTRUCTION (CAMBODIA) CO., LTD.

Contractor for pre-stressed floor construction

Minh Duc Post-Tension

Scale

Using 12.7mm prestressed cable of Chinese origin

Weight: 11 Tons

Construction progress 

15 days /floor

CONSTRUCTION IMAGES

SORA GARDENS II

BASIC INFORMATION

Project name 

SORA GARDENS II

Scope of work

Supply and construct the prestressed cable 

Location

Lot C17, Area B, Hung Vuong Street, Hoa Phu Ward, Thu Dau Mot city - Binh Duong 

Owner

Becamex Tokyu Co., Ltd

Design Consultant

ACONS

Supervision Consultant

Atelia Vietnam Co., Ltd

Prestressed Cable Contractor

Minh Duc Post-Tension Co., Ltd

Scale 

2 Blocks, 22 floors/ block

Using prestressed cable: Diameter 12.7mm, origin: China

Weight: 192 tons

Start time 

12/2019

CONSTRUCTION IMAGES

Hai Bao Garment Factory

BASIC INFORMATION

Project Name 

Hai Bao Garment Factory

Scope of work

Supply and construct the prestressed cable 

Location

Dan Tien Commune, Khoai Chau District, Hung Yen Province

Owner

HAI BAO CO., LTD

Design Consultant

J-TECH., JSC

Supervision consultant

TDT CONSTRUCTION INVESTMENT AND CONSULTING JOINT STOCK COMPANY

Contractor for pre-stressed floor construction

Minh Duc Post-Tension Co., Ltd

Scale

Level 1 building

1 block with 5 floors (1 roof + 1 tum), floor area:  6,000m2

Using prestressed cable: Diameter 15.24mm, origin: Thailand

Weight: 79 tons 

Start time 

08/2020

CONSTRUCTION IMAGES

IEC Residences

BASIC INFORMATION

Project name

IEC Residences 

Scope of work 

Optimal design and prestressed cable construction

Location

Tu Hiep, Thanh Tri, Hanoi

Owner

IEC CONSTRUCTION INVESTMENT AND MECHANICAL ELECTRIC JOINT STOCK COMPANY

Design Consultant

Minh Duc Comec

Supervision Consultant

CONSULTANT AND INSPECTION JOINT STOCK COMPANY OF CONSTRUCTION TECHNOLOGY AND EQUIPMENT

Prestressed Cable Contractor

Minh Duc Comec

Scale 

3 high-rise buildings CT1 (27 floors), CT2 (23 floors), CT3 (21 floors) with 3 basements 

Prestressed cable detaisl: Diameter 15.24mm, origin: Thailand

Weight: 344 tons
 

Start time

02/2020

CONSTRUCTION IMAGES

NOVOTEL PROJECT

BASIC INFORMATION

Project name

NOVOTEL PROJECT

Scope of work

Design, supply and construction of prestressed floor

Address

City center, Phnom Penh, Cambodia.

Owner

China construction fourth engineering division (cambodia) co.,ltd

Contractor for pre-stressed floor construction

Minh Duc Post-Tension

Scale

13,828m2

26 floor

Using 12.7mm prestressed cable of Chinese origin

Weight: 71 tons

Construction progress 

7 days/floor