News

BUSINESS OPERATIONS

Minh Duc Group Launches "Minh Duc Ambassador 2026" Emulation Movement with Total Prizes of 100,000,000 VND

Beyond a regular recognition award, "Minh Duc Ambassador 2026" is a journey to find cultural icons – where dry KPI figures are transformed into inspiring stories and a spirit of iron discipline.
The media 05 - 03 - 2026

The Guardian of Enthusiasm on the Construction Site: When Discipline is Instinct and Safety is Life

In the emotional moments between the final days of 2025 and the doorstep of Spring 2026, while life seems to slow down for new beginnings, the "breath" of machinery and people at the Regent Factory site (Phu Tho) has not rested for a single minute. Amidst the biting cold of the midlands winter, engineer Bui Chi Tam and his teammates persistently remain at the site, lighting the fire of enthusiasm to dispel the frost of the early new year.
The media 05 - 03 - 2026

Minh Duc Post-Tension Deploys Post-Tensioning Cable Systems at the "Golden Land" of Thu Thiem

In early January 2026, Minh Duc Post-Tension was actively deploying post-tensioning cable items at The Opusk project (An Khanh Ward, Thu Duc City, Ho Chi Minh City). The construction work is being organized synchronously, closely following the overall schedule and fully complying with the technical requirements of the approved design documents.
The media 05 - 03 - 2026

Spring Launch 2026: Minh Duc Construction Group Unites with "One Team - One Belief"

On the morning of February 24, 2026 (the 8th day of the first lunar month in the Year of the Horse), in the joyful atmosphere of the New Year, Minh Duc Construction Group solemnly organized the 2026 Spring Launch and Deployment Ceremony with the strategic theme "One Team - One Belief".

Project news

Project news, Featured news 02 - 06 - 2026

Minh Duc EC Collaborates with International Partner Strata for Professional Training and Field Testing at the Hoa Binh - Moc Chau Expressway Project

From May 14 to May 16, 2026, Minh Duc EC collaborated with its strategic partner, Strata, to organize a series of specialized training programs combined with field testing at the Hoa Binh - Moc Chau Expressway project (Son La province). This event contributed to enhancing the technical capabilities of the engineering team and realizing the application of advanced integrated geotechnical solutions in one of the nation's key transport infrastructure projects.
Project news 13 - 04 - 2026

In 2025, Minh Duc COMEC supplied materials for over 300 projects nationwide.

In 2025 alone, Minh Duc COMEC supplied materials for more than 300 transportation and civil construction projects across the country. Our supply capacity reached a significant scale, including over 15,000 tons of post-tensioning cables, nearly 50,000 tons of various types of anchors, nearly 200,000 meters of corrugated ducts, along with bridge bearing and expansion joint systems serving approximately 50 expressway and bridge projects spanning across three regions.
Project news 23 - 12 - 2025

Impression of Post-Tensioned Structural Construction at Long Thanh International Airport Project

As part of the process of completing the auxiliary infrastructure system for the Long Thanh International Airport project, the Catering Service Factory held its topping-out ceremony on December 19, marking a significant milestone in completing the chain of facilities designed to operate the airport according to international standards.

HEADQUARTERS

Address: Minh Duc Building, 301 Phuc Loi Street, Phuc Loi Ward, Hanoi.

Hotline: (+84-24) 3657 4146

Email: info@minhduccorp.com.vn

SOUTHERN BRANCH

Address: 40 Vu Tong Phan Street, 21st Street, Binh Trung Ward, Ho Chi Minh City.

Hotline: 028.6658.4123

CENTRAL VIETNAM BRANCH:

Address: Lot 26-28, B3, Golden Hills, Hai Van Ward, Da Nang City.

Hotline: (+84-236) 6253668

CAMBODIA BRANCH:

Address: 10A1, Street No. 1, Phnom Penh Thmey, Sen Sok, Phnom Penh.

Hotline: +855 97 550 6662

LEOSTONE STONE AND TILE WAREHOUSE:

Address: 4 Chu Van An Street, Ha Dong Ward, Hanoi.

Hotline: 0965630220 - 0353575757

SOUTHERN WAREHOUSE

Address: National Highway N2, Hamlet 1B, Duc Hoa Commune, Tay Ninh Province.

Hotline: 028 6658 4123

FRENCH BRANCH:

Address: Bâtiment 12, 4 Route de Gisy, 91570 Bièvres 


Hotline: (+33) 658 984 733 


CONNECT WITH US: